The building of Laygoland International Airport. Click up to see more airport photos and my Star Wars Minifigure Collection.

001_site_looking_north.jpg

…ng_north.jpg

002_site_looking_south.jpg

…ng_south.jpg

003_survey_crew.jpg

…vey_crew.jpg

004_project_supervisor_arrives.jpg

…_arrives.jpg

005_unloading_stakes.jpg

…g_stakes.jpg

006_surveying_begins.jpg

…g_begins.jpg

007_surveying_parking_garage.jpg

…g_garage.jpg

008_surveying_airport_hotel.jpg

…rt_hotel.jpg

009_surveying_main_terminal.jpg

…terminal.jpg

010_more_stakes_arrive.jpg

…s_arrive.jpg

011_surveying_northeast_retention_basin.jpg

…on_basin.jpg

012_surveying_concourse_and_gates.jpg

…nd_gates.jpg

013_project_sponsor_sign_arrives.jpg

…_arrives.jpg

014_airport_sponsors.jpg

…sponsors.jpg

015_concourse_and_gates.jpg

…nd_gates.jpg

016_survey_boss_hard_at_work.jpg

…_at_work.jpg

017_surveying_control_tower.jpg

…ol_tower.jpg

018_southwest_retention_basin.jpg

…on_basin.jpg

019_unloading_heavy_equipment.jpg

…quipment.jpg

020_crew_supervisor_arrives.jpg

…_arrives.jpg

021_surveying_fire_station.jpg

…_station.jpg

022_wide_load.jpg

…ide_load.jpg

023_admiring_the_horsepower.jpg

…rsepower.jpg

024_discussing_the_surveying.jpg

…urveying.jpg

025_grader_arrives.jpg

…_arrives.jpg

026_parking_the_compactor.jpg

…ompactor.jpg

027_more_equipment_arrives.jpg

…_arrives.jpg

028_ready_for_the_party.jpg

…he_party.jpg

029_setting_up.jpg

…tting_up.jpg

030_champagne_anyone.jpg

…e_anyone.jpg

031_police_chief_interviewed.jpg

…erviewed.jpg

032_group_photo.jpg

…up_photo.jpg

033_ready...jpg

…_ready...jpg

034_set...jpg

…34_set...jpg

035_ground_breaking.jpg

…breaking.jpg

036_smiles_and_handshakes.jpg

…ndshakes.jpg

037_interview.jpg

…nterview.jpg

038_good_luck_boss.jpg

…uck_boss.jpg

039_crew_takes_a_break.jpg

…_a_break.jpg

040_overview1.jpg

…verview1.jpg

041_nice_to_meet_you.jpg

…meet_you.jpg

042_crew_arrives.jpg

…_arrives.jpg

043_scraper_rolls_out.jpg

…olls_out.jpg

044_morning_traffic_jam.jpg

…ffic_jam.jpg

045_second_scraper_rolls_out.jpg

…olls_out.jpg

046_important_equipment_arrives.jpg

…_arrives.jpg

047_water_truck_arrives.jpg

…_arrives.jpg

048_scrapers_dig_in.jpg

…s_dig_in.jpg

049_first_load.jpg

…rst_load.jpg

050_sign_moves.jpg

…gn_moves.jpg

051_keeping_the_dust_down.jpg

…ust_down.jpg

052_fossil_fuels_arrive.jpg

…s_arrive.jpg

053_give_me_a_push.jpg

…e_a_push.jpg

054_diggers_begin_on_terminal.jpg

…terminal.jpg

055_semi_crew_takes_a_break.jpg

…_a_break.jpg

056_scrapers_hard_at_work.jpg

…_at_work.jpg

057_work_continues.jpg

…ontinues.jpg

058_maintenance.jpg

…ntenance.jpg

059_hey_you_are_overloaded.jpg

…erloaded.jpg

060_terminal_work_continues.jpg

…ontinues.jpg

061_trench_work_begins.jpg

…k_begins.jpg

062_another_backhoe.jpg

…_backhoe.jpg

063_overview2.jpg

…verview2.jpg

064_how_does_it_look.jpg

…_it_look.jpg

065_talking_about_the_runways.jpg

…_runways.jpg

066_piping_arrives.jpg

…_arrives.jpg

067_digger_maintenance.jpg

…ntenance.jpg

068_its_about_time.jpg

…out_time.jpg

069_finally_an_office.jpg

…n_office.jpg

070_trench_work_continues.jpg

…ontinues.jpg

071_survey_crew_starts_on_the_runway.jpg

…e_runway.jpg

072_how_many_gallons_per_mile.jpg

…per_mile.jpg

073_installing_piping.jpg

…g_piping.jpg

074_overview3.jpg

…verview3.jpg

075_final_grading_of_terminal.jpg

…terminal.jpg

076_sewer_work_begins.jpg

…k_begins.jpg

077_overview4.jpg

…verview4.jpg

078_briefing.jpg

…briefing.jpg

079_checking_final_grade.jpg

…al_grade.jpg

080_runway_survey_complete.jpg

…complete.jpg

081_its_good_to_be_out_of_the_trench.jpg

…e_trench.jpg

082_sewer_pipes_get_installed.jpg

…nstalled.jpg

083_overview4.jpg

…verview4.jpg

084_trench_almost_finished.jpg

…finished.jpg

085_grading_of_concourse.jpg

…oncourse.jpg

086_sewer_work_progresses.jpg

…ogresses.jpg

087_thats_a_big_pipe.jpg

…big_pipe.jpg

088_digging_southwest_retention_basin.jpg

…on_basin.jpg

089_overview5.jpg

…verview5.jpg

090_tower_foundation_prep.jpg

…ion_prep.jpg

091_first_sewer_line_complete.jpg

…complete.jpg

092_concrete_contractor_arrives.jpg

…_arrives.jpg

093_scrapers_start_on_main_runway.jpg

…n_runway.jpg

094_concrete_crew_arrives.jpg

…_arrives.jpg

095_retention_basin_work_continues.jpg

…ontinues.jpg

096_forms_go_in.jpg

…ms_go_in.jpg

097_runway_work_continues.jpg

…ontinues.jpg

098_get_it_fixed.jpg

…it_fixed.jpg

099_two_in_the_same_day.jpg

…same_day.jpg

100_help_arrives.jpg

…_arrives.jpg

101_overview6.jpg

…verview6.jpg

102_water_and_hydrant_lines.jpg

…nt_lines.jpg

103_back_in_business.jpg

…business.jpg

104_southwest_retention_basin_finished.jpg

…finished.jpg

105_form_work_continues.jpg

…ontinues.jpg

106_thanks_for_the_help_today.jpg

…lp_today.jpg

107_joe_gets_heat_exhaustion.jpg

…haustion.jpg

108_joe_is_taken_for_observation.jpg

…ervation.jpg

109_boss_we_have_got_a_problem.jpg

…_problem.jpg

110_the_survey_is_wrong.jpg

…is_wrong.jpg

111_concrete_crew_gets_back_to_work.jpg

…_to_work.jpg

112_checking...jpg

…ecking...jpg

113_survey_crew_was_off__a_lot.jpg

…f__a_lot.jpg

114_starting_over_on_the_parking_garage.jpg

…g_garage.jpg

115_having_a_talk.jpg

…g_a_talk.jpg

116_runway_work_continues.jpg

…ontinues.jpg

117_ready_for_concrete.jpg

…concrete.jpg

118_we_are_pouring_all_of_this_today.jpg

…is_today.jpg

119_crew_arrives.jpg

…_arrives.jpg

120_hey_joe_is_back.jpg

…_is_back.jpg

121_lights_for_later.jpg

…or_later.jpg

122_am_briefing.jpg

…briefing.jpg

123_first_truck_arrives.jpg

…_arrives.jpg

124_second_truck_arrives.jpg

…_arrives.jpg

125_hard_at_work.jpg

…_at_work.jpg

126_second_sewer_line_begins.jpg

…e_begins.jpg

127_moving_along.jpg

…ng_along.jpg

128_overview7.jpg

…verview7.jpg

129_how_is_the_new_survey_coming.jpg

…y_coming.jpg

130_hey__can_you_move_this_trailer.jpg

…_trailer.jpg

131_break_time.jpg

…eak_time.jpg

132_half_way_there.jpg

…ay_there.jpg

133_getting_close.jpg

…ng_close.jpg

134_almost_there.jpg

…st_there.jpg

135_finishing_up_under_the_lights.jpg

…e_lights.jpg

136_removing_the_forms.jpg

…he_forms.jpg

137_hydrant_work_resumes.jpg

…_resumes.jpg

138_overview8.jpg

…verview8.jpg

139_runway_work_continues.jpg

…ontinues.jpg

140_more_equipment.jpg

…quipment.jpg

141_lots_of_gravel.jpg

…f_gravel.jpg

142_hyrdrants_arrive.jpg

…s_arrive.jpg

143_form_work_begins_on_terminal.jpg

…terminal.jpg

144_second_sewer_line.jpg

…wer_line.jpg

145_first_hydrant_is_installed.jpg

…nstalled.jpg

146_work_continues.jpg

…ontinues.jpg

147_overview_9.jpg

…erview_9.jpg

148_checking_the_grade.jpg

…he_grade.jpg

149_runway_bed_almost_finished.jpg

…finished.jpg

150_second_sewer_line_almost_complete.jpg

…complete.jpg

151_hydrant_work_wraps_up.jpg

…wraps_up.jpg

152_terminal_ready_for_concrete.jpg

…concrete.jpg

153_work_begins_on_the_parking_garage.jpg

…g_garage.jpg

154_final_sewer_connection.jpg

…nnection.jpg

155_work_begins_on_taxiways.jpg

…taxiways.jpg

156_concrete_arrives_for_the_terminal.jpg

…terminal.jpg

157_hard_at_work.jpg

…_at_work.jpg

158_fill_dirt_gets_hauled_away.jpg

…led_away.jpg

159_moving_along.jpg

…ng_along.jpg

160_diggers_reunite.jpg

…_reunite.jpg

161_building_subcontractor_arrives.jpg

…_arrives.jpg

162_taxiway_work_continues.jpg

…ontinues.jpg

163_tower_pieces_arrive.jpg

…s_arrive.jpg

164_getting_close.jpg

…ng_close.jpg

165_another_survey_is_off.jpg

…y_is_off.jpg

166_cleaning_up.jpg

…aning_up.jpg

167_the_big_crane_arrives_tomorrow.jpg

…tomorrow.jpg

168_northeast_retention_pond__new_survey.jpg

…w_survey.jpg

169_taxiway_work_progresses.jpg

…ogresses.jpg

170_the_big_crane_arrives.jpg

…_arrives.jpg

171_the_tower_begins_its_ascent.jpg

…s_ascent.jpg

172_overview_10.jpg

…rview_10.jpg

173_new_survey_complete.jpg

…complete.jpg

174_tower_work.jpg

…wer_work.jpg

175_overview_11.jpg

…rview_11.jpg

176_parking_garage_ready_for_grading.jpg

…_grading.jpg

177_look_at_this_beast.jpg

…is_beast.jpg

178_wheres_the_concrete.jpg

…concrete.jpg

179_work_begins_on_the_gates.jpg

…he_gates.jpg

180_up_we_go.jpg

…up_we_go.jpg

181_the_runway_is_born.jpg

…_is_born.jpg

182_gate_work_continues.jpg

…ontinues.jpg

183_parking_garage_grading_almost_complete.jpg

…complete.jpg

184_taking_a_break.jpg

…_a_break.jpg

185_overview_12.jpg

…rview_12.jpg

186_waiting_for_gravel.jpg

…r_gravel.jpg

187_business_end.jpg

…ness_end.jpg

188_making_progress.jpg

…progress.jpg

189_gravel_arrives_for_taxiways.jpg

…taxiways.jpg

190_tower_continues_to_climb.jpg

…to_climb.jpg

191_last_two_loads.jpg

…wo_loads.jpg

192_finished.jpg

…finished.jpg

193_its_a_runway.jpg

…a_runway.jpg

194_the_semi_trucks_can_barely_keep_up.jpg

…_keep_up.jpg

195_forms_for_the_parking_garage.jpg

…g_garage.jpg

196_taxiway_work_continues.jpg

…ontinues.jpg

197_wrapping_up_for_the_day.jpg

…_the_day.jpg

198_work_on_west_gates_begin.jpg

…es_begin.jpg

199_tower_reaches_for_the_sky.jpg

…_the_sky.jpg

200_gate_work_progresses.jpg

…ogresses.jpg

201_tower_crew_now_waiting_for_cab_parts.jpg

…ab_parts.jpg

202_overview_13.jpg

…rview_13.jpg

203_work_begins_on_northeast_retention_basin.jpg

…on_basin.jpg

204_gate_work_continues.jpg

…ontinues.jpg

205_finishing_the_east_gates.jpg

…st_gates.jpg

206_tower_cab_work_begins.jpg

…k_begins.jpg

207_more_cab_pieces.jpg

…b_pieces.jpg

208_southwest_retention_basin_fills_up.jpg

…fills_up.jpg

209_the_work_never_ends.jpg

…ver_ends.jpg

210_higher_and_higher.jpg

…d_higher.jpg

211_floor_for_main_cab.jpg

…main_cab.jpg

212_northeast_retention_basin_finished.jpg

…finished.jpg

213_pouring_parking_garage_foundation.jpg

…undation.jpg

214_cab_glass_installed.jpg

…nstalled.jpg

215_more_concrete.jpg

…concrete.jpg

216_gate_work_progresses.jpg

…ogresses.jpg

217_starting_to_look_like_a_tower.jpg

…_a_tower.jpg

218_half_way_there.jpg

…ay_there.jpg

219_roof_installed.jpg

…nstalled.jpg

220_long_weekend_everyone_gets_friday_off.jpg

…iday_off.jpg

221_wrapping_up.jpg

…pping_up.jpg

222_klias_new_tower.jpg

…ew_tower.jpg

223_overview_14.jpg

…rview_14.jpg

224_more_sewer_work.jpg

…wer_work.jpg

225_they_sure_planted_this_grass_fast.jpg

…ass_fast.jpg

226_gate_work_resumes.jpg

…_resumes.jpg

227_you_have_got_to_be_kidding.jpg

…_kidding.jpg

228_overview_15.jpg

…rview_15.jpg

229_help_arrives.jpg

…_arrives.jpg

230_moving_along.jpg

…ng_along.jpg

231_more_taxiway_work.jpg

…way_work.jpg

232_back_in_business.jpg

…business.jpg

233_gate_work_wraps_up.jpg

…wraps_up.jpg

234_diggers_back_at_work.jpg

…_at_work.jpg

235_overview_16.jpg

…rview_16.jpg

236_sewer_pipes_arrive.jpg

…s_arrive.jpg

237_stocking_up_before_work_begins.jpg

…k_begins.jpg

238_nonstop_taxiway_work.jpg

…way_work.jpg

239_more_equipment.jpg

…quipment.jpg

240_another_sewer_line_completed.jpg

…ompleted.jpg

241_taxiway_work_continues.jpg

…ontinues.jpg

242_surveying_second_runway.jpg

…d_runway.jpg

243_more_sewer_work.jpg

…wer_work.jpg

244_terminal_work_begins.jpg

…k_begins.jpg

245_earth_moving_resumes_tomorrow.jpg

…tomorrow.jpg

246_second_runway_survey_complete.jpg

…complete.jpg

247_work_continues_on_terminal_entrance.jpg

…entrance.jpg

248_runway_work_begins.jpg

…k_begins.jpg

249_more_concrete.jpg

…concrete.jpg

250_entrance_doors_installed.jpg

…nstalled.jpg

251_working_hard_on_the_runway.jpg

…e_runway.jpg

252_another_taxiway_completed.jpg

…ompleted.jpg

253_just_getting_started...jpg

…tarted...jpg

254_overview_17.jpg

…rview_17.jpg

255_taxiway_work_goes_on.jpg

…_goes_on.jpg

256_fill_dirt_all_gone.jpg

…all_gone.jpg

257_first_of_the_windows_are_installed.jpg

…nstalled.jpg

258_another_taxiway_is_born.jpg

…_is_born.jpg

259_northeast_retention_pond_fills_up.jpg

…fills_up.jpg

260_hard_at_work.jpg

…_at_work.jpg

261_windows_and_doors_arrive.jpg

…s_arrive.jpg

262_i_like_to_weld_how_bout_you.jpg

…bout_you.jpg

263_more_trench_work.jpg

…nch_work.jpg

264_form_work_for_the_gates.jpg

…he_gates.jpg

265__work_continues.jpg

…ontinues.jpg

266_overview_18.jpg

…rview_18.jpg

267_earth_moving_resumes.jpg

…_resumes.jpg

268_halfway_there.jpg

…ay_there.jpg

269_concrete_for_the_gates.jpg

…he_gates.jpg

270_another_hydrant.jpg

…_hydrant.jpg

271_parking_garage_pieces_arrive.jpg

…s_arrive.jpg

272_security_office_and_information_desk.jpg

…ion_desk.jpg

273_more_taxiway_work.jpg

…way_work.jpg

274_morning_briefing.jpg

…briefing.jpg

275_work_on_east_taxiways.jpg

…taxiways.jpg

276_west_gates_are_completed.jpg

…ompleted.jpg

277_work_begins_on_parking_garage.jpg

…g_garage.jpg

278_terminal_work_continues.jpg

…ontinues.jpg

279_going_in_for_repairs.jpg

…_repairs.jpg

280_parking_garage_moving_along.jpg

…ng_along.jpg

281_more_taxiway_work.jpg

…way_work.jpg

282_gravel_arrives_for_runway.jpg

…r_runway.jpg

283_baggage_return_area.jpg

…urn_area.jpg

284_another_morning_briefing.jpg

…briefing.jpg

285_work_begins_on_the_fire_station.jpg

…_station.jpg

286_terminal_work_wraps_up.jpg

…wraps_up.jpg

287_parking_garage_moving_along_quickly.jpg

…_quickly.jpg

288_runway_bed_complete.jpg

…complete.jpg

289_first_ramp_installed.jpg

…nstalled.jpg

290_fire_station_work_continues.jpg

…ontinues.jpg

291_second_ramp_piece_and_stairway_work.jpg

…way_work.jpg

292_second_runway_is_born.jpg

…_is_born.jpg

293_ramp_and_second_level_deck_work.jpg

…eck_work.jpg

294_moving_along.jpg

…ng_along.jpg

295_electricians_arrive_to_install_the_lights.jpg

…e_lights.jpg

296_second_level_work.jpg

…vel_work.jpg

297_form_work_for_the_fire_station.jpg

…_station.jpg

298_taxiway_work_moving_along_quickly.jpg

…_quickly.jpg

299_deck_work_almost_complete.jpg

…complete.jpg

300_the_beast_is_getting_a_workout.jpg

…_workout.jpg

301_another_crane.jpg

…er_crane.jpg

302_work_begins_on_baggage_return.jpg

…e_return.jpg

303_hard_at_work.jpg

…_at_work.jpg

304_concrete_for_the_fire_station.jpg

…_station.jpg

305_baggage_return_finished.jpg

…finished.jpg

306_moving_along.jpg

…ng_along.jpg

307_another_stairway.jpg

…stairway.jpg

308_finished.jpg

…finished.jpg

309_baggage_carrousel_for_ticket_counters.jpg

…counters.jpg

310_pumper_truck_arrives.jpg

…_arrives.jpg

311_finishing_the_food_courts.jpg

…d_courts.jpg

312_pouring_concrete_on_the_second_level.jpg

…nd_level.jpg

313_fire_chief_arrives.jpg

…_arrives.jpg

314_pouring_continues.jpg

…ontinues.jpg

315_almost_finished.jpg

…finished.jpg

316_second_level_finished.jpg

…finished.jpg

317_second_level_with_striping.jpg

…striping.jpg

318_first_level_with_striping.jpg

…striping.jpg

319_first_of_two_food_shops.jpg

…od_shops.jpg

320_overview_19.jpg

…rview_19.jpg

321_third_level_supports.jpg

…supports.jpg

322_offices.jpg

…_offices.jpg

323_third_level_deck_work.jpg

…eck_work.jpg

324_work_begins_on_fire_station.jpg

…_station.jpg

325_entrance_road_and_hotel_foundation_work.jpg

…ion_work.jpg

326_office_work_wraps_up.jpg

…wraps_up.jpg

327_more_earth_moving.jpg

…h_moving.jpg

328_more_third_level_work.jpg

…vel_work.jpg

329_heavy_equipment_begins_to_leave.jpg

…to_leave.jpg

330_fire_station_progresses.jpg

…ogresses.jpg

331_chairs_arrive.jpg

…s_arrive.jpg

332_gravel_for_entrance_road.jpg

…nce_road.jpg

333_more_fire_station.jpg

…_station.jpg

334_more_fill_dirt_hauled_away.jpg

…led_away.jpg

335_ready_for_concrete.jpg

…concrete.jpg

336_chairs_installed.jpg

…nstalled.jpg

337_fire_station_moving_along.jpg

…ng_along.jpg

338_halfway_there.jpg

…ay_there.jpg

339_entrance_road_finished.jpg

…finished.jpg

340_pouring_third_level.jpg

…rd_level.jpg

341_pouring_continues.jpg

…ontinues.jpg

342_nearing_the_end.jpg

…_the_end.jpg

343_third_level_finished.jpg

…finished.jpg

344_third_level_with_striping.jpg

…striping.jpg

345_hey_the_arc_welding_team_is_back.jpg

…_is_back.jpg

346_electricians_back_at_work.jpg

…_at_work.jpg

347_work_begins_on_walkway.jpg

…_walkway.jpg

348_stairs_being_installed.jpg

…nstalled.jpg

349_walkway_stairs_arrive.jpg

…s_arrive.jpg

350_first_chopper_lands.jpg

…er_lands.jpg

351_walkway_deck_work.jpg

…eck_work.jpg

352_windows_installed.jpg

…nstalled.jpg

353_roof_installed.jpg

…nstalled.jpg

354_east_side_garage_doors_installed.jpg

…nstalled.jpg

355_form_work_for_hotel.jpg

…or_hotel.jpg

356_west_side_garage_doors_installed.jpg

…nstalled.jpg

357_pouring_hotel_foundation.jpg

…undation.jpg

358_pouring_almost_finished.jpg

…finished.jpg

359_cleaning_up.jpg

…aning_up.jpg

360_taxiway_work_resumes.jpg

…_resumes.jpg

361_overview20.jpg

…erview20.jpg

362_a_new_crane_arrives.jpg

…_arrives.jpg

363_work_begins_on_the_hotel.jpg

…he_hotel.jpg

364_unscheduled_maintenance.jpg

…ntenance.jpg

365_fire_station_second_level_work_begins.jpg

…k_begins.jpg

366_work_continues.jpg

…ontinues.jpg

367_finally_pouring_concrete.jpg

…concrete.jpg

368_lifting_the_lift.jpg

…the_lift.jpg

369_busy_jobsite.jpg

…_jobsite.jpg

370_crew_quarters_moving_along.jpg

…ng_along.jpg

371_cleaning_up_after_a_long_day.jpg

…long_day.jpg

372_a_new_front_loader.jpg

…t_loader.jpg

373_prep_work_for_second_floor.jpg

…nd_floor.jpg

374_office_and_eating_areas.jpg

…ng_areas.jpg

375_base_work_continues_for_the_tarmac.jpg

…e_tarmac.jpg

Views: 89516

Folder created: 2008/05/11 12:43:44

Folder updated: 2009/04/19 03:07:23

System Stats:

4933577 Files430740 Folders

All Gallery contents are copyright of their owners. Everything else ©1998-2020 Brickshelf II, LLC. All rights reserved.
Brickshelf is a trademark of Brickshelf II, LLC. LEGO® is a trademark of the LEGO Group. Brickshelf is neither owned nor operated by the LEGO group.
Brickshelf is not responsible for content uploaded by users.